Prosjekter

Slop Water Treatment CFU 2x050

EPC-Supply at a two stage Haz. slop water treatment system for Gjøa/Statoil.
Plant for Statoil/Gjøa Platform:
-EPC with UFAT
-Design to EU Directive, Norsok and Statoil Requirements.
-Designed in 25% Superduplex Material.
-Installed fully control system w/RIO.
-Approved by Finn Strøm AS


 

Produced Water Treatment CFU 4x330 Second Stage

EPC Supply at a 25 tonnes two stream CFU for Gjøa/Statoil.
Permanent Plant for Statoil/Gjøa Platform:
- EPC with UFAT
- Design to EU Directive, Norsok and Statoil Requirements.
- Designed in 22% Duplex Material.
- Installed fully control system w/RIO.
- Approved by Finn Strøm AS


 

Produced Water Treatment CFU 1x030 First Stage

EPC-Supply at a smaller first stage CFU for Gjøa/Statoil.
Permanent Plant for Statoil/Gjøa Platform:
-EPC with UFAT
-Design to EU Directive, Norsok and Statoil Requirements.
-Designed in 22% Duplex Material.
-Installed fully control system w/RIO.
-Approved by Finn Strøm AS


 

Umbilical Sheave Analysis

Structure Calculation of four (4) different umbilical sheaves for offshore handling.


 

Offshore Crane Life Time Analysis

- AL-1525, located on board Statfjord A.
- Analysis of rest life time for offshore Pipe Handling crane, slewing ring and crane foundation.