Project Description

Produced Water Treatment systems

Scope of Work:

  • North Sea-, GOP-, BP- standard and documentation
  • Design and detailed engineering
  • Calculation of:
    – Process
    – Structure.
    – Piping, flow and flex.
    – Noise.
  • Design to PED/EN13445, Norsok, PD 5500, ASME VII.
  • CS, 316, 22% Duplex and 25% Super duplex Material.

References CFU systems (Schlumberger):

  • Gudrun EPCh Deck, CFU 6/140 MS2
  • Gudrun EPCh Deck, CFU 2/15 MS3
  • BAHREGAN DISTRICT Oil Fields, CFU 6/150 MS4
  • BAHREGAN DISTRICT Oil Fields, (2) CFU 8/330 MS4
  • BAHREGAN DISTRICT Oil Fields, CFU 6/220 MS4 #300)
  • CFU 1/7 MS3 (2 off, one BP spec)
  • Unit with 3 CFU 14/1000 MS3 for Libya.
  • Garoupa/Petrobras -2xCFU6/150
  • ChevronTexaco, Alba Platform , 2xCFU 6/150
  • Oseberg, 2 x CFU 6/150
  • Mærsk Dubai and North Sea 2 x CFU6/100
  • Hydro/Brage, 2xCFO6/150 + Reject
  • Total / Elgin PUQ , 2 x CFO 6/150
  • Gjøa, 1 Stage CFU 1 x 30 CFU
  • Gjøa, 2nd stage CFU 4 x 330
  • Gjøa Slope, CFU 2 x 50

References internals for CFU (Schlumberger):

  • One (1) Internal package to CFU 10/420 MS4, CUU Long, Vietnam.
  • One (1) Internal package to CFU 3/30 MS4, Ivar Aasen, Det Norske.
  • Three(3) Internal packages to CFU 12/720 MS2, Statoil Mariner.
  • Two (2) Internal packages to CFU 10/420 MS4, Ivar Aasen, Det Norske.
  • Two (2) Internal packages to CFU 8/350 MS3, Pemex (Mexico)
  • Two (2) Internal packages to CFU 8/330 MS4, Samarang (Vietnam)
  • Two (2) Internal packages to CFU 1/6 MS2 (Canada)
  • Two (2) internal packages to Richform, CFU10/600 MS4 (China)
  • One (1) internal package, CFU10/500 MS4 (China)
  • Two (2) internal packages to Richform, CFU10/500 MS3 (China)
  • One (1) internal package to WKO 10/500 (China).
  • One (1) internal package CFU6/140 MS4 to RP Dragon Field (Vietnam)
  • One (1) Internal Package to CFU 12/670 Basic for Apache Field, (UK)